Are acronyms getting in the way of progression and adoption of time saving technology? Here is an insert I took from a document I read in relation to Building Information Modelling (BIM) and Standards.
“Most CEN and CENELEC Committees have parallel activities in ISO and IEC, and in some cases the same organisation provides the Secretariat for both an international and regional Committee. There are agreements between CEN/CENELEC and ISO/IEC regarding exchange of information” ……………..
Here is my take on the industry :
I have been reading through many documents on Building Information Modelling (BIM) of late; no wonder so many peoples heads spin. To be honest, Building Information Modelling is really not that complicated. We have been doing it the hard way for centuries and Building Information Modelling is simply a 3D model created with a Computer Aided Drawing (CAD) program to organise & simplify the process of design, construction, manufacturing and maintenance. Surely we do not need hundreds of acronyms to convey this? Are the editors lazy or is it that the puzzle has not been 100% solved? Let’s just make it that little bit harder to decipher a document shall we?
As you may all know I am a big fan of creating & refining systems to increase productivity. I was introduced to our industry at 15 years of age and even back then I thought to myself that this industry needs some innovation. I am hardly considered an intellect yet blind Fred could read the writing on the wall. I was taught to draw by hand with the old cedar drawing board , T Square and one of those new fan dangle clutch pencils which saved us all a good 5 seconds of hard labour sharpening.
Before I decipher the acronyms I would like to give an overview of where I think we are now. I choose to skip the 2D CAD days as essentially they yield a similar result to hand drawing. I am going to skip a decade or two so you can get back to your paying jobs.
Today we have drawing tools that are easy to use and have the ability to represent every element in 3D, every nut bolt and screw if you chose to do so ( I hope you don’t). Lets look at what we really need out of a drawing to build and maintain the dwelling. Do we need acronyms? I do not think so. So what do we need to design and build a project?
Items 3 to 10 can be accomplished with traditional 2D drawing and paper documentation, yet 3D drawings with Building Information are far more efficient and easier to interpret, therefore attracting more clients to BIM adopters. Put simply the art of BIM is associating appropriate information with geometry and using a system that extracts the necessary data that is related to the construction and maintenance of the facility. What does that mean? It means the geometry/Model represent the Building, the components that it is made from & the Information clarifies the who, what, why where and when.
BIM breaks down the top 10 items into categories and structure to efficiently store and handle documentation. We as designers and builders do not have to do this, it is being done for us. However we do need to understand the process, which I must say is a lot easier than creating the process.
For Building Information Modelling to be successful there need to be standards. These standards need to be easy to read and understand. Below I have decided to start compiling a list of commonly used acronyms you may find helpful… Feel free to add more as no doubt there are many I have missed.
Acronyms associated with Architecture and Building Information Modelling (BIM)
AEC | Architecture Engineering and Construction |
BOQs | Bill Of Quantities |
CAD | Computer Aided Design |
CAE | Computer Aided Engineering. |
CAM | Computer Aided Manufacturing |
CGI | Computer Generated Imagery |
FM | Facilities Management |
GIS | Geographical Information System. |
IFC | Industry Foundation Class |
IPD | Integrated Project Delivery |
IPE | Integrated Project Environments |
ISO | International Standards |
LOD | Level of Development |
MEP | Mechanical Electrical Plumbing |
QTO | Quantity Take Off |
ROI | Return on Investment |
VDC | Virtual Design & Construction |
WD | Working Draft |
4D | Linking of 3D CAD components or assemblies with time/schedule |
5D | Linking of 3D CAD components or assemblies with schedule & cost |
Let me just say BIM is not hard. There are various software packages out there that enable steps 1 to 10 to be refined and they get better every year. I personally use PlusSpec as it reduces the likelihood of error and it does more for less money. Some others in the industry use Revit, Archicad & Bentley and all of the products are simply tools to help reduce time and increase efficiency. With the introduction of IFC (a format that can be used various brands of software) we can all now collaborate on the same drawings and information associated with the project regardless of products we use or how much we pay for them.
[ssba]
1 Comment
Andrew Dwight
AIM – asset information model
AIR – asset information requirements
ALO – architectural liaison officer
BASIR – built asset security information requirements
BASMP – built asset security management plan
BASS – built asset security strategy
BEP – BIM execution plan
BIM – building information modelling
BS – British Standard
BYOD – bring your own device
CDE – common data environment
CESG – the national technical authority for information
assurance
CIO – chief information officer
CISO – chief information security officer
COBie – construction operation building information
exchange
CPDA – crime prevention design advisor
CPNI – Centre for the Protection of National
Infrastructure
EIR – employer’s information requirements
FM – facilities management
IAAS – infrastructure as a service
ISO – International Standards Organization
MIDP – master information delivery plan
NaCTSO – National Counter Terrorism Security Office
OIR – organizational information requirements
PAAS – platform as a service