I want to lower the sheathing and exterior cladding (Dryvit) to cover the floor joists. I could manually pull the sheathing on each wall face from the subfloor down to the foundation. When I tried the same for the Dryvit, only the white core will pull down and not the green face.
Please let me know how I can drop the Dryvit (including the green face) down to the foundation. As well, is there a more efficient and quicker way to accomplish or does this scenario require manual modification?
Thank you for the help.